Storage building

We modelled all disciplines in the storage building Project, all the elements were modelled in a LOD 350 with a construction area of 19311 m2. The objective of the Project was the interdisciplinary coordination based on the federated BIM Model, this model allowed us to: Make Clash-Detection tests on modeled elements, 3D visualization of the Project and tests for the client to make sure that the Works to be executed were viable.

Project Objectives

  • BIM modelling in a LOD 350, of all the project disciplines, including: Architecture, Structure, Mechanical, Electrical and Plumbing. 
  • Interdisciplinary coordination based on the federated model 
  • Clash-Detection between modeled elements 
  • Modelling of Urbanism and exterior areas 
  • Quantities and materials takeoff

Final results

  • Federated model with all project disciplines 
  • Floor plans 
  • Sections plans 
  • 3D coordination views
  • Project BEP 
  • Progress reports 
  • Clash Detection