We modelled all disciplines in the storage building Project, all the elements were modelled in a LOD 350 with a construction area of 19311 m2. The objective of the Project was the interdisciplinary coordination based on the federated BIM Model, this model allowed us to: Make Clash-Detection tests on modeled elements, 3D visualization of the Project and tests for the client to make sure that the Works to be executed were viable.